Battery storage for factories and industrial sites
Factories and industrial sites typically run long operating hours with predictable load profiles, often pay demand charges and frequently have rooftop space for solar. Battery storage fits naturally into that picture. Raylin Energy assesses factory and industrial sites from 200 kWh to 10 MWh, on the same 261 kWh all-in-one liquid-cooled platform we scale from a single cabinet to multi-megawatt-hour systems. Raylin Energy is the EPC general contractor: we sign the project contract and stay your single accountable party for equipment, design, commissioning oversight and after-sales, with construction delivered by qualified, licensed Australian subcontractors we select and manage.
Factories where battery storage pays back fastest
The strongest candidates share three traits: high electricity cost as a share of revenue, predictable operating hours, and some flexibility about when electricity is consumed.
Food processing
Refrigeration, mixers, packaging lines. Long hours, demand charges, predictable load.
Meat processing
Continuous refrigeration. Strong demand-cap and backup case.
Cold storage
24/7 refrigeration. Battery backup avoids product loss and costly restart cycles.
Manufacturing
Shifts, motors, processes. Demand charges dominate the bill.
Packaging
High-throughput lines. Battery sized to the consistent daily peak.
Plastics
Process heating, extruders, injection moulding. Energy intensity is the opportunity.
Building materials
Crushing, kilns, batching. Heavy demand charges matter at scale.
Warehousing
Material handling, charging, lighting. Solar covers daytime; battery covers the rest.
One product, three factory scales
Factories do not need exotic battery architectures — they need a cabinet that holds up to continuous load and can be added to as the site grows. The 261 kWh all-in-one liquid-cooled cabinet we supply to Australian sites is the same unit our manufacturing partner has delivered at multi-megawatt-hour scale on industrial projects in China, from a single cabinet behind a smaller line up to 28 cabinets on a 7.3 MWh site. Three typical configurations cover the bulk of Australian factory enquiries.
A single shift or two, demand charges above 80 kVA. Often the first step for a small factory before a rooftop solar retrofit is added later. Sized to cap the recurring demand peak, not to cover a full shift.
Continuous operation or two shifts, refrigeration plus process load. Sized to cap the demand peak and shift consumption into the off-peak window on time-of-use tariffs. This is the most common factory scale we quote.
24/7 refrigeration, meat or food processing, large cold storage. Requires a full network connection study, protection coordination and staged commissioning. Reference projects on the same platform are in the case library on the commercial battery storage page.
Three signals that you should at least ask
You do not need to commit to a battery to find out whether one would help. Three things on your existing bill tell you most of what you need to know.
If yes, look at the kVA or kW figure. This is the number your battery would aim to cap. Many Australian commercial tariffs charge more per kW of peak demand than per kWh of energy — sometimes dramatically more.
If yes, look at the peak period price (often 3 pm–9 pm on weekdays) and the off-peak price. The gap is the value a battery can capture by shifting consumption from peak to off-peak.
Single-shift vs 24/7 changes the answer significantly. A 24/7 refrigeration site has a different optimum than a single-shift manufacturing site. Send us your operating hours and we will tell you what shifts.
How a factory project works
You submit
The assessment form takes about five minutes. Your latest electricity bill, your site address, your operating hours and the one-line description of what the factory does. Send the bill as PDF or photo — a photograph is fine.
Charlene replies
Charlene (Director, Australia Business Development & Operations) reads your enquiry and replies from charlene@raylin-energy.com within one business day. A first-pass sizing range and a list of any follow-up questions.
We assess your bill & load
We analyse your tariff, demand profile, and operating hours against published NSW / VIC / QLD program criteria where one applies. If a full assessment is not justified at this stage, we tell you — and explain what would change that.
We send a written proposal
After a short call: written sizing recommendation, indicative pricing, published-program incentive guidance, and a project timeline. Everything in writing so you can compare side-by-side with other options.
We supply + your installer installs
Once terms are agreed, we mobilise the equipment and our selected Australian construction subcontractor. Network connection approval is managed end-to-end (Ausgrid / Endeavour / Essential Energy in NSW, Citipower / United in VIC, Energex / Ergon in QLD). You deal with one contract — ours.
Commission & handover
Commissioning, protection settings, and the documentation your electrical contractor and the DNSP need. We do not employ in-house Australian installation crews — every site is built by accredited local partners working under our project management.
Note on promises. We do not claim to employ in-house Australian installation crews. We do not guarantee government incentive outcomes. We do not give payback figures before we have seen a bill. See the commercial battery storage page for the full list.
Send us your bill
A free assessment starts with your latest electricity bill and a short conversation. We reply within one business day.
Other commercial & industrial pages
Each page focuses on a different entry point — choose the one that matches your situation.
Commercial battery storage
200 kWh – 10 MWh projects for NSW, VIC and QLD sites. Peak shaving, demand management, time-of-use load shifting.
Solar + batteryCommercial solar + battery
Pair rooftop or ground-mount solar with battery storage. Self-consume daytime generation into the evening peak.
NSWNSW commercial battery guidance
BESS5 program details, EcoVantage as ACP, network connection for Ausgrid/Endeavour/Essential Energy.
AssessmentRequest a project assessment
Free assessment starts with your latest electricity bill. We reply within one business day.
Official policy reference. The Peak Shifting (BESS5) category is published on the NSW Energy Savings Scheme site: Peak Shifting (BESS5) · PDRS Rule and BESS5 requirements. The scheme site is the source of record; we summarise the criteria for planning.