Commercial & Industrial

Commercial solar + battery for Australian sites

Pair rooftop or ground-mount solar with battery storage and you generate, store and use your own daytime electricity — while keeping peak demand under control. Raylin Energy assesses Australian commercial and industrial sites from 200 kWh to 10 MWh for solar + battery combinations, on the same 261 kWh all-in-one liquid-cooled platform we scale from a single cabinet to multi-megawatt-hour systems. Raylin Energy is the EPC general contractor: we sign the project contract and stay your single accountable party for equipment, design, commissioning oversight and after-sales, with construction delivered by qualified, licensed Australian subcontractors we select and manage.

200 kWh–10 MWhBattery range
50 kW–2 MWSolar range
NSW · VIC · QLDActive states
1 business dayReply time
Why solar + battery together

Three things the combination does that each alone cannot

Self-consumption Use daytime solar in the evening

Without a battery, excess solar during the day is exported at a low feed-in tariff. With a battery, that excess is stored and discharged during the expensive evening window — the same electrons, used at a higher value.

Demand + solar Smaller battery needed for same peak cut

Pairing solar with a battery reduces the battery capacity needed to achieve a given demand reduction, because the solar array contributes to the daytime peak. This often lowers the total project cost compared with storage alone.

Backup resilience Keep critical loads running

When paired with a battery sized for the critical sub-panel, solar continues to recharge the battery during a daytime outage — extending the time critical loads can run compared with a standalone battery backup.

Configurations

How the system is usually set up

Three patterns cover most Australian commercial solar + battery projects. The right one depends on your existing infrastructure and tariff.

AC-coupled Battery sits behind existing solar

If you already have a working solar inverter, an AC-coupled battery can be added without disturbing the solar side. Common retrofit for sites that installed solar before storage was economic.

DC-coupled Solar and battery share a hybrid inverter

For new builds or full re-fits, a single hybrid inverter handles solar and battery on the DC side. Higher round-trip efficiency, but you replace the existing solar inverter.

Solar-only first Add battery later

If capital is the constraint, install solar now and add battery storage 6–18 months later once you have a year of operating data. The same inverters will usually accept the battery without rework.

Sizing

Solar size and battery size are independent choices

Solar sizing depends on roof area, tariff and operating hours. Battery sizing depends on demand charges, evening load and resilience needs. The right ratio is rarely 1:1 in kWh.

We size each side from your bill, your site constraints and your operating hours, then check the ratio against the bill rather than guessing. The assessment starts with a copy of your most recent electricity bill — usually a PDF from your retailer portal.

Start with your electricity bill
What we will not promise

Honesty before marketing

  • We do not guarantee specific kWh generation figures — actual solar output depends on your roof orientation, tilt, shading and weather, and we cannot measure that without seeing the site.
  • We do not guarantee a fixed percentage bill reduction. We will outline what is plausible given your tariff and load, and we will explain the assumptions we make.
  • We do not guarantee government incentive outcomes. We will tell you what is currently published and what your eligibility looks like.

For a full list of what we will not claim, see our commercial battery storage page.

Want us to look at your bill?

Submit your latest electricity bill and a short description of your site. We reply within one business day.

Request a project assessment Email Charlene
Working with EcoVantage — accredited certificate provider for NSW PDRS BESS5 Westpac — customer finance by referral; assessed by the bank

Official policy reference. The Peak Shifting (BESS5) category is published on the NSW Energy Savings Scheme site: Peak Shifting (BESS5) · PDRS Rule and BESS5 requirements. The scheme site is the source of record; we summarise the criteria for planning.