Request a Commercial Project Assessment

Tell us about your site and your project — built around the 261 kWh all-in-one liquid-cooled platform, scaled from 200 kWh to 10 MWh. A free assessment starts with your most recent electricity bill and a short conversation. We reply within one business day. Your information is stored securely and is not shared with advertising platforms.

Home/Request a project assessment
About 5 minutes. The form below is the fastest way to scope a project, and if any field is unclear you can leave it — we will follow up by email. Start with a recent electricity bill (PDF or photo) and your site address; that alone lets us give you a real answer rather than a brochure.
What a complete project file contains (21 inputs)

A preliminary solution needs 21 inputs across four groups. You do not need all of them to start — we ask for the ones that change the answer, then request the rest during scoping.

Project overview
  • Project location
  • Facility type and operating profile
  • Expected project timeline
  • Procurement stage
  • Target commissioning date
Site & approval
  • Grid connection details
  • Network service provider
  • Planning approval status
  • Available site layout and single-line diagram
Electrical & energy data
  • Existing solar PV capacity
  • Proposed new solar PV capacity
  • Existing solar inverter capacity
  • Site load profile
  • Interval electricity data, preferably 12 months
  • Maximum demand
  • Electricity tariff
Storage requirements
  • Required ESS power (kW)
  • Required ESS energy (kWh)
  • Backup duration or autonomy requirement
  • Critical load demand
  • EMS, PLC or demand-response interface requirements

The single most valuable item is interval data — 12 months if you have it. A PDF bill gives us your tariff and maximum demand; interval data tells us the shape of your load, and that is what actually determines whether a battery pays back. If you cannot export it, a photograph of the bill is fine to start.

Your business

Your project

10–2000 characters. Avoid sensitive personal information beyond what is needed.
Stored privately. Used only by the Raylin team to read your tariff and consumption profile.

By submitting you are agreeing to the privacy policy. We reply within one business day.

Not sure if battery storage is right for your site? Email Charlene with two lines: (1) your NSW / VIC / QLD suburb, (2) your average monthly bill. Charlene will tell you honestly whether a full assessment is worth it — and what would change that.
Related

Other commercial & industrial pages

Each page focuses on a different entry point — choose the one that matches your situation.

Working with EcoVantage — accredited certificate provider for NSW PDRS BESS5 Westpac — customer finance by referral; assessed by the bank

Official policy reference. The Peak Shifting (BESS5) category is published on the NSW Energy Savings Scheme site: Peak Shifting (BESS5) · PDRS Rule and BESS5 requirements. The scheme site is the source of record; we summarise the criteria for planning.